Specific to IESCO

What differs for IESCO consumers

National ENC portal
Does not serve IESCO for this step. IESCO uses its own ENC portal at iesco.enc.com.pk for new connections, change applications, and tracking.
Portal to use
iesco.enc.com.pk
IESCO helpline
051-111-786-786
Service area
Islamabad, Rawalpindi, Attock, Chakwal, Jhelum
What that means locally
IESCO covers the planned sectors of Islamabad and dense Rawalpindi alongside the more spread-out Potohar plateau districts of Attock, Chakwal, and Jhelum — new connections in the capital's sector grid usually sit close to underground feeders, while Potohar-belt applications more often need overhead pole extensions across open terrain.

The documents, fees and stage-by-stage flow are set nationally and are the same for every DISCO — they are written up once on the application-tracking process page rather than repeated here.

IESCO — Application Tracking

Track IESCO Application

IESCO uses a separate portal

IESCO uses its own ENC portal at iesco.enc.com.pk for new connections, change applications, and tracking.

Visit Official Portal →
Application Tracking Guide — IESCO

IESCO Application Tracking — Complete Guide

Once a IESCO application leaves your hands, it moves through survey, demand notice, and installation stages tracked centrally — this guide explains what each status means for applicants across Islamabad, Rawalpindi, Attock. IESCO covers the planned sectors of Islamabad and dense Rawalpindi alongside the more spread-out Potohar plateau districts of Attock, Chakwal, and Jhelum — new connections in the capital's sector grid usually sit close to underground feeders, while Potohar-belt applications more often need overhead pole extensions across open terrain.

IESCO Helpline:051-111-786-786

How to Use the IESCO Tracking Tool

No login, no account — just the tracker above and either your Tracking ID or your CNIC. Here's how the lookup actually works, start to finish.

1

Pick Application Type

"New Connection" for a fresh meter, "Change Application" for a name, tariff, or load change on an existing IESCO meter.

2

Choose Search Method

Tracking ID if you saved the 11-digit reference number, or CNIC — the 13-digit national identity number, no dashes.

3

Enter & Hit Track

Double-check the number before submitting. The tool pulls live data from the official database and returns your current stage, Demand Notice status, and next steps at once.

Can't find the Tracking ID? Search by CNIC instead — every application filed under that identity card number comes back at once, pending and completed alike.

What Every IESCO Status Actually Means

A status message with no explanation attached is either good news or nothing to worry about — but it rarely feels that way in the moment. Here's what each one means in plain terms, and what, if anything, it asks of you.

Application Submitted / Received

Nothing to do yet

IESCO has logged the application and assigned it a reference number — your first real confirmation the submission went through. Data entry is reviewing your documents right now. Keep the Tracking ID safe (phone notes, a screenshot, and a paper backup all at once isn't overkill) and check back in 3–5 days.

Document Verification / Under Review

Keep your phone on

IESCO staff are cross-checking what you submitted — CNIC, ownership proof, witness details, the wiring report. Anything that looks off gets a call or SMS to your registered number, so don't let it go unanswered. This stage typically runs 3–7 working days; keep the original documents within reach in case an office visit gets requested.

Survey Scheduled / Field Visit Pending

Be home on survey day

A IESCO engineer has been assigned to inspect the property in person — measuring the distance from the nearest pole, checking spare transformer capacity in the area, and deciding whether new poles or cable runs are needed. Have someone home and the path to the proposed meter point clear. A missed visit means rescheduling, and that costs days.

Survey Completed / Report Submitted

Waiting on the Demand Notice

The engineer's finished the site inspection and filed a report covering materials, cost estimate, and feasibility. IESCO now works from that report to prepare the Demand Notice — usually 5–14 working days depending on backlog. There's genuinely nothing to do on your end here beyond checking back periodically.

Demand Notice Issued

Print and pay now

A real milestone: the Demand Notice is ready, listing exactly what you owe before IESCO installs the meter — service line, poles, transformer contribution, security deposit, registration. Print it with the Print Demand Notice tool, take it to any bank the notice lists, and pay the full amount. These expire, so don't let it sit.

Payment Received / DN Paid

Upload the receipt

IESCO has your payment confirmation and the application is moving into procurement and work-order territory. That confirmation lands faster, though, if you upload the bank receipt yourself through the Upload Demand Notice tool — it typically shaves 1–3 days off the verification wait even when you already paid at the counter. Worth the two minutes.

Work Order Issued / Installation Booked

Someone needs to be home

Installation is on the schedule and a crew has been assigned. They may call ahead or simply show up, so keep someone responsible at the property with access to where the meter goes, plus your CNIC and Tracking ID ready for verification. The install itself usually wraps in a few hours.

Connection Done / Commercial

You're connected

The meter's in, read, and live in the IESCO billing system — your first bill arrives with the next monthly cycle. On installation day itself, write down the meter serial number and the opening reading and photograph the installed meter. That record is what protects you if a later bill looks wrong.

Realistic Timeline: How Long Each Stage Actually Takes

Not knowing whether a wait is normal or something's actually gone wrong is one of the most common frustrations here. These are honest ranges for each stage of a typical IESCO application.

StageTypical DurationWhat Affects Speed
Application submission → Review3–7 working daysCompleteness and quality of documents submitted
Review → Survey scheduling7–15 working daysAvailability of survey engineers in your area
Survey → Demand Notice5–14 working daysComplexity of connection, report backlog
DN issuance → Payment processing1–3 working days after bank paymentHow quickly you upload the receipt
Payment → Work Order7–14 working daysMaterial availability, crew workload
Work Order → Meter installation2–7 working daysCrew schedule and site accessibility

Submission to a live connection: 45 to 90 days for a standard domestic case, quicker if you respond fast at each checkpoint, slower when surveys back up or a Demand Notice sits unpaid. IESCO covers the planned sectors of Islamabad and dense Rawalpindi alongside the more spread-out Potohar plateau districts of Attock, Chakwal, and Jhelum — new connections in the capital's sector grid usually sit close to underground feeders, while Potohar-belt applications more often need overhead pole extensions across open terrain. The payment and upload steps remain the two places where your own speed makes the biggest difference.

Your Action Checklist at Every Stage

Most IESCO applications stall not because something went wrong, but because the applicant missed the cue to act. Run through this whenever your status changes.

Just submitted

  • Save the Tracking ID in three places — phone notes, a screenshot, and on paper
  • Keep your registered mobile reachable; IESCO calls if a document needs clarifying
  • Check status again in 3–5 days

Document review in progress

  • Keep the original CNIC, property documents, and neighbour's bill within reach
  • Answer calls from unknown numbers during this window — it may be the review officer
  • Don't resubmit before the status actually changes

Survey pending

  • Clear the area around the proposed meter location
  • Confirm an adult will be home on the likely survey date
  • On a larger property, mark the boundary clearly so the engineer can find it

Demand Notice issued

  • Print it immediately with the Print Demand Notice tool on this site
  • Pay the full amount at any bank the notice lists
  • Photograph the receipt and upload it the same day through the Upload DN tool

Payment uploaded

  • Give it 1–3 banking days to verify
  • Call the helpline with your Tracking ID if nothing's changed after 4 days
  • Get your CNIC ready for the installation visit

Work order issued

  • Keep someone at the property at all times — the crew doesn't always call ahead
  • Have the CNIC and Tracking ID physically on hand
  • Clear the path from the pole to the meter board and the outdoor meter location

Connection done

  • Note the meter serial number and opening reading right away
  • Photograph the installed meter on day one
  • Check your first bill against that reading when it arrives

Common Problems & How to Fix Them

The same handful of issues account for most IESCO tracking complaints every year. Here's each one and exactly what resolves it.

Problem: Status hasn't moved in over two weeks

Fix: Call 051-111-786-786 and quote your Tracking ID — ask which department currently has the file and what the expected turnaround is. Often one follow-up call is enough to get it moving again.

Problem: Got "Documents Incomplete" or the application bounced back

Fix: Read the rejection note carefully — it names the specific document or detail that's missing — and resubmit only that. Blurry scans, un-attested CNIC copies, and property documents that don't exactly match the applicant's name cause most of these.

Problem: The survey team came but nobody was home

Fix: Call the IESCO helpline and request a re-survey with your Tracking ID ready. Expect at least 7–14 extra days for the second visit, so leave a backup mobile number at the office for scheduling calls.

Problem: The Demand Notice expired before I could pay

Fix: Take your original Tracking ID and CNIC to the nearest IESCO subdivision office and ask for a fresh one. This is routine and gets re-issued, though a new DN can take 3–7 days to appear in the system.

Problem: Paid, but status still reads "DN Issued" after 4 days

Fix: That almost always means the receipt hasn't been uploaded yet — do it through the Upload Demand Notice tool. If it's already uploaded and still hasn't updated after 5 days, call the helpline with the payment date, bank name, and transaction number in hand.

About Islamabad Electric Supply Company (IESCO)

Company Overview

Islamabad Electric Supply Company, a WAPDA successor entity regulated by NEPRA, handles the supply, distribution, and connection services in its territory — domestic, commercial, industrial, and agricultural consumers alike.

Service Areas

Islamabad, Rawalpindi, Attock, Chakwal, Jhelum and surrounding districts — every town, union council, and rural area in these regions routes its new-connection requests through IESCO.

Customer Helpline

Status queries, Demand Notice issues, billing complaints, or a stalled application worth escalating:

051-111-786-786

Frequently Asked Questions

What IESCO applicants actually ask, answered directly.

Where do I track a IESCO new connection application?+

Use the tracker at the top of this page. Pick "New Connection" from the application-type dropdown, then choose whether you're searching by Tracking ID or CNIC. Enter the 11-digit Tracking ID if you saved it, or your 13-digit CNIC (no dashes) if you didn't. Hit Track and the current stage, any Demand Notice details, and what's next load immediately.

Where does the IESCO Tracking ID come from, and what if I've lost it?+

IESCO generates it automatically the moment your new-connection or change application is submitted at the official portal — 11 digits, shown on the confirmation screen and sent by SMS to whatever mobile number you registered with. Save it somewhere durable; you'll need it again to track, print, pay, and upload against the same application. Lost it anyway? Your CNIC pulls up the same record.

What does "Demand Notice Issued" actually mean on a IESCO application?+

It means the technical survey stage is behind you. IESCO's engineering team has already inspected the site, worked out the materials — poles, cable, transformer share — and turned that into a Demand Notice stating what you owe. From here: print it with the Print Demand Notice tool, pay at any bank listed on the notice, then upload the receipt through the Upload Demand Notice tool.

My IESCO status hasn't moved in days — is that normal?+

Up to a point, yes — processing speed swings with application volume, how many survey engineers are free in your area, and regional backlog. Past 10–15 working days with zero movement, call 051-111-786-786 and quote your Tracking ID, or take the application form and CNIC to the nearest IESCO district or subdivision office. Most stalls trace back to an incomplete document or a survey that's still waiting to be scheduled — both move faster once you follow up in person.

Can this same tracker follow a IESCO change application too?+

Yes — new connection and change applications (name, tariff, load) both run through it. Just switch the application-type dropdown to match, then search by Tracking ID or CNIC as usual. Change applications move through a near-identical sequence: Received → Under Review → Survey (load changes only) → Demand Notice → Payment → Work Order → Completed.

What happens once I upload the IESCO payment receipt?+

IESCO checks it against the bank — usually 1–3 banking days — then flips your status to "Payment Verified" or "Material Procurement." A work order follows, and the installation team will reach out to fix a date; make sure someone's available at the property that day. Once the meter's in, the status becomes "Connection Done / Commercial" and your first bill lands in the next billing cycle.

More IESCO Services on Electricity Bill

Everything else you're likely to need while a IESCO connection is in progress.

IESCO New ConnectionApply for a fresh meterIESCO Change ApplicationName, tariff, or loadPrint Demand NoticeDownload your DNPay Demand NoticeOnline payment (LESCO)Upload Payment ReceiptAfter bank paymentAll ServicesFull service directory

اردو میں پڑھیں

This page is also available in Urdu for ایسکو customers.

اردو →